Custom artificial-lift pump development integrating mechanical, hydraulic, control and monitoring requirements for GLNG service.

Challenge

The engineering problem

Develop a purpose-built artificial-lift solution that could operate within demanding field constraints while coordinating mechanical, hydraulic, control and monitoring interfaces.

Approach

How the problem was worked through

  1. 01Translate operating requirements into a defined mechanical and hydraulic design basis
  2. 02Develop the equipment concept and critical interfaces
  3. 03Perform engineering calculations and design development
  4. 04Coordinate the multi-system design into a practical equipment package
Outcome

Project result

A custom equipment solution developed around the actual operating duty and interface requirements.

Mechanical designHydraulicsEquipment developmentEngineering analysis